Breaker control unit
Breaker supervision
Connect switching indications and supervised breaker interfaces with the equipment and event they describe. Keep the requested action and resulting feedback clear.
Keep switching feedback in context
Knowing that a breaker changed state is only part of the story. Supervision links the equipment identity, feedback and operating event so that teams can follow what was requested and what the equipment reported.
We review the site arrangement, equipment interfaces and intended functions with your team before defining the final configuration.
Discuss your requirementPurpose in the field
What it brings to the installation
Keep command intent, equipment feedback and the resulting record connected.
- Relate breaker feedback to the correct device and circuit.
- Provide a defined interface for the installation’s supervision requirements.
- Keep operating records available for later investigation.
The platform connection
Working with Cetus
The breaker remains an electrical asset in the grid twin. Supervision evidence contributes to its state and event history. Command permissions, interlocks and protection responsibilities must be engineered for the installation before control is commissioned.
Explore the Cetus PlatformPlan the installation
Start with the right information.
Bring these details to the engineering discussion so that the equipment, integration and operating requirements can be reviewed together.
- 01Breaker mechanism and manufacturer interfaces
- 02Required indications, command signals and interlocks
- 03Control power, isolation and commissioning checks
Build the whole connection
Related equipment
Consider the measurement, integration and supervision functions together.
Local intelligence
Bring feeder, breaker, metering and cabinet observations together. Keep local analytics, retained history and communication close to the transformer.
Feeder monitoring
See current, voltage, power and energy at the individual feeder. Relate phase imbalance, loading and power-quality records to the circuit that needs attention.
Fused switching
Plan outgoing switching ways alongside the monitoring and supervision the cabinet needs. Keep the electrical arrangement and equipment requirement together.
Start with your network