Auri Energy / Transformer asset intelligence
Put loading history to work for the asset.
Understand repeated overload, phase imbalance and the conditions that contribute to transformer stress before deciding what to inspect or replace.
Discuss this applicationThe operating challenge
Transformer asset intelligence
A single loading figure rarely explains the history of an asset. Demand peaks, uneven phases, power-quality conditions and the surrounding environment all influence the questions a maintenance engineer needs to ask.
The Auri Energy approach
Bring the pieces together.
The local transformer twin relates its ratings and configured model to feeder observations and operating history. Available temperature or cabinet-condition inputs can strengthen the assessment. Measured values and model estimates remain distinguishable.
A clearer basis for the next decision.
Use the combined view to focus maintenance, review operating limits and prepare a reinforcement study. Thermal and ageing assessments require an appropriate model, inputs and validation for the asset.
Read the relevant Cetus guideInformation that matters
Start with the right inputs.
- Transformer ratings and model parameters
- Loading, phase imbalance and power-quality history
- Available ambient, cabinet and thermal observations
From information to action
How the work comes together.
- Review the asset and the pattern of demand it carries.
- Examine stress indicators and the quality of their inputs.
- Compare inspection, maintenance and reinforcement options.
Related applications
Transformer and feeder monitoring
Understand how each feeder and phase contributes to the load on a distribution transformer. Give operations and planning teams a closer view of the circuits that supply their customers.
Explore the applicationPower quality
Connect voltage complaints and power-quality events to the equipment, phases and operating conditions behind them.
Explore the applicationGrid twins and network planning
Bring equipment, connections, measurements and assumptions together before assessing a change to the grid.
Explore the applicationBring us your network challenge.
Tell us about the equipment, the information you have and the decision you need to make. We will help define a practical starting scope.